Bulk Urea Railway Loading Facility 

Project objectives have been the modification of the existing urea transport system, installation of new conveyor belts, new weighing, wagon handling, wagon housing, tower building rehabilitation, utilities. LUDAN scope was Turn key (EPC) execution including: conceptual design; CAPEX estimation; permitting; civil expertise; detail design for all disciplines: technology, civil and structural, piping, mechanical, electrical and automation, process control; demolition works; procurement; construction works; project coordination and management.

CLIENT:  AZOMURES S.A. / PROJECT: BULK UREA RAILWAY LOADING FACILITY /                 LOCATION: TARGU MURES, ROMANIA / TYPE OF WORK: TURN-KEY (EPC) / PERIOD: 2016 - 2017

Ammonium nitrate and Calcium ammonium nitrate multi flattening plant

The Customer modernization program consist of upgrading the Ammonium nitrate and Calcium ammonium nitrate flattening units, especially by rehabilitation of the existing buildings, dismantling and demolition of the obsolete equipment, design and procurement of new equipment, new instrumentation and control for the above plants. Ludan scope was the turn-key execution: complete design, procurement, construction, commissioning.

CLIENT: AZOMURES s.a. / PROJECT: (NH4)(NO3) AND Ca(NO3)2 MULTI-FLATTENING PLANT / LOCATION: targu mures, ROMANIA / TYPE OF WORK: turn key (epc)

Liquid fertilizer terminal with loading – unloading facilities

The Customer has decided to improve the export capacity by building a terminal of 20,000 m³ liquid fertilizers, 2×10,000 m³ tanks, railway unloading and vessel loading facilities, automation and fiscal measurements. LUDAN has executed based on Turn key contract the basic and detail design; procurement; construction; commissioning. 

CLIENT: AZOMURES s.a. / PROJECT: LIQUID FERTILIZER TERMINAL / LOCATION: CONSTANTA, ROMANIA / TYPE OF WORK: TURN KEY (EPC)

Computerized Maintenance Management System Implementation

LUDAN ENGINEERING was awarded with a contract for Computerized Maintenance Management System implementation - IBM MAXIMO software. Scope of work consist in: Technical and functional solution design, Work Management, Asset Management, KPIs, Reports, Materials Management interface with SAP, Interface with Oracle Primavera Interface with SKF Decision Support; training.

CLIENT: AZOMURES s.a. / PROJECT:  COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM IMPLEMENTATION / LOCATION: TarGu MURES, ROMANIA / TYPE OF WORK: SOFTWARE IMPLEMENTATION